Bataan to Cavite in less than an hour? It will be possible soon. NEDA (National Economic and Development Authority) just approved Bataan-Cavite Interlink Bridge Project. Thanks to Build, Build, Build, program by Duterte Administration! The project will help cut down travel time and ease traffic congestion in Metro Manila as well as South Luzon and North Luzon gateway through the construction of a 32.15-km, four-lane (two lanes each direction) bridge starting from Barangay Alas-asin in Mariveles, Bataan, crossing Manila Bay and terminating in Barangay Timalan, Naic, Cavite. It also involves the construction of two navigation bridges, interchanges, land viaducts, turnaround facilities, special span bridge near Cavite coast, toll plaza and administration building, as well as the improvement of local existing junctions. The project will be implemented over a period of six years. Make a wise investment.
|
Categories
All
|